Français Anglais Russe

Social housing and intermediate housing in RIAD EL BERNOUSSI.

Ryad Bermoussi

This project is built on a hilly terrain of 176 000 m² overlooking an old quarry, the site of a former quarry with a total area of 176,000 m².

The housing development represents a total covered surface area of 260 000 m². It comprises:

  • 114 buildings R 4 comprising 3462 housing units and 144 shops, representing a total covered surface area of 208 000 m²;
  • 14 buildings R 5 with basement comprising 353 housing and 62 shops, representing a total covered surface area of 40,000 m²;
  • 9 public facilities buildings R to R 4 (mosques, oven and steam bath, junior high school, police station, community center, vocational training center, ...), representing a covered area of 12,000 m²;
  • The Roads system, walkways and parking surface area is 45 000 m²

The volume of earthworks including re-profiling of the quarry is 400 000 m³. The construction time of the transaction is 1yr.

 

5 stars hotel complex BARCELO in Annakhil - MARRAKECH.

Photo à venir

This project comprises 212 keys for double rooms and suites.

The total covered area by the whole operation is 20 000 m², over a land surface of 27,500 m².

EMTB assumes all trades building "turnkey" project.

The lead time is 22 months, scheduled for delivery last quarter of 2012.

 

4 stars hotel complex HUSA in Annakhil - MARRAKECH.

Photo à venir

This project includes 167 keys for double rooms, suites and duplexes.

The total covered area by the whole operation is 15 000 m² on a plot of 27,500 m².

EMTB assumes all trades building "turnkey" project.

The lead time is 22 months, scheduled for delivery last quarter of 2012.

 

HIDALGO residential and tourism project in Larache.

Hidalgo

This project includes 70 residential units, divided into 6 buildings R + 2.

The total covered area to build is 10,000 m².

The lead time is 1 year.

 

Luxury residential estate - AKENZA GOLF RESORT - in Tameslouht, MARRAKECH.

Akenza, ensemble résidentiel

This project consists of:

  • 234 apartments R + 1, from 75 m² to 130 m² each;
  • 28-Riads R + 2, from 200 m²to 240 m² each.

The total area covered by the operation is 30 000 m² on a plot of 66,000 m².

The anticipated construction time for the whole operation is 2 years.

EMTB is currently achieving all trades building at present "turnkey", the show buildings of This operation consists of 9 apartments and 2 Riads.

The completion of these show buildings is expected in summer 2011.

 

Set of luxury villas - PALM GOLF RESORT the VILLAS – in Al Maaden, MARRAKECH.

Al Maaden

This project consists of 150 R + 1 villas located on the Golf of Al Maaden.

The total area covered by the whole operation is about 100,000 m²:

EMTB is currently achieving all trades building "turnkey" of the first part of 15 villas R + 1, with a covered area of 600 m² each.

The deadline for the construction of this first part is 16 months.

 

  Video of construction: Al Maaden

Set of luxury villas - Akenza GOLF the Villas - in Tameslouht, MARRAKECH.

Akenza, ensemble de villas de standing

This project consists of 327 R + 1 villas located on the golf of Akenza.

The total area covered by the whole operation is about 130,000 m².

EMTB is currently achieving all trades building "turnkey", 5 show villas, with a covered area ranging between 350 and 550 m² each.

The completion of these show buildings is expected in summer 2011.

 

Club-House Golf Port Lixus

EMT BATIMENT - Club-House Golf Port Lixus

Club House in all trades.

Key quantities:

  • 1,000 m³ of concrete
  • 70 T steel
  • 2,200 m² masonry
  • 6600 m² of coating
  • 1,500 m² floor

Deadline: 6 months.

  Photos of construction: Club-House Golf Port Lixus

  Video of construction: Club-House Golf Port Lixus