This project is built on a hilly terrain of 176 000 m² overlooking an old quarry, the site of a former quarry with a total area of 176,000 m².
The housing development represents a total covered surface area of 260 000 m². It comprises:
The volume of earthworks including re-profiling of the quarry is 400 000 m³. The construction time of the transaction is 1yr.
This project comprises 212 keys for double rooms and suites.
The total covered area by the whole operation is 20 000 m², over a land surface of 27,500 m².
EMTB assumes all trades building "turnkey" project.
The lead time is 22 months, scheduled for delivery last quarter of 2012.
This project includes 167 keys for double rooms, suites and duplexes.
The total covered area by the whole operation is 15 000 m² on a plot of 27,500 m².
EMTB assumes all trades building "turnkey" project.
The lead time is 22 months, scheduled for delivery last quarter of 2012.
This project includes 70 residential units, divided into 6 buildings R + 2.
The total covered area to build is 10,000 m².
The lead time is 1 year.
This project consists of:
The total area covered by the operation is 30 000 m² on a plot of 66,000 m².
The anticipated construction time for the whole operation is 2 years.
EMTB is currently achieving all trades building at present "turnkey", the show buildings of This operation consists of 9 apartments and 2 Riads.
The completion of these show buildings is expected in summer 2011.
This project consists of 150 R + 1 villas located on the Golf of Al Maaden.
The total area covered by the whole operation is about 100,000 m²:
EMTB is currently achieving all trades building "turnkey" of the first part of 15 villas R + 1, with a covered area of 600 m² each.
The deadline for the construction of this first part is 16 months.
This project consists of 327 R + 1 villas located on the golf of Akenza.
The total area covered by the whole operation is about 130,000 m².
EMTB is currently achieving all trades building "turnkey", 5 show villas, with a covered area ranging between 350 and 550 m² each.
The completion of these show buildings is expected in summer 2011.
Club House in all trades.
Key quantities:
Deadline: 6 months.